Frequently Asked Questions Sign In  |  Register
News
Art-Villa Garikula Tower Restoration has Begun
17 August, 2017

With the support of the National Agency for Cultural Heritage Protection and TBC Bank, the Art-Villa Garikula tower is being restored.

TBC Bank describes project aim to The aim to strengthen the most architectural details of Art-Villa Garikula – renovate its floors and rugs.

After that, the original function of Rotonda will be returned -as the owner of the palace and its designer, as well as locals say, Rotonda had luminous function and was shining in special occasions.

Art-Villa Garikula, Bolgarakiaant Palace in the past, was built in 1885 in the village of Garikula by a civil engineer of Polish origin, Vasili Bolgarski.

Today, the building is a monument of architecture of a national importance. All work related to the restoration of the building is carried out under the supervision of the National Agency for Cultural Heritage Preservation, Art-Villa Garikula and its festival Fest I Nova with the support of traditional sponsor TBC Bank.

According to the bank’s information, nowadays, rotation requires reinforcement, reclamation of wood and changing the floor. This is the minimum that needs to bring this palace to the architectural level of the palace. Specialists of the National Agency for Cultural Heritage of Georgia have already started work on the restoration project, at the end of which the agreement will begin to replace the railings and stairs and the floor.

www.cbw.ge


© 2011-2017, TRAVEL IN GEORGIA.